Delivering Superior Roofing Solutions for Over 25 Years
Half of Hollywood was built between 1948 and 1968, which means concrete block houses with shallow pitches and flat additions that nobody planned to keep this long. Add three blocks of salt spray off the Broadwalk and you get roofs that look fine from the street and are failing at the fasteners. We inspect for free, pull the City of Hollywood permit, and tell you which of those two problems you actually have.
Call (954) 773-9965Most Hollywood replacements start as a leak nobody could chase down. We tear off to the deck, replace any sheathing that has gone soft, re-nail to current code, and install a system rated for this wind zone. On homes east of Dixie we specify corrosion-resistant fasteners and flashing as standard, not as an upgrade line item.
Get a replacement quoteNew builds, garage conversions, and the additions Hollywood homeowners keep adding to 1950s footprints. We roof from the plans, coordinate the dry-in so your other trades are not standing around, and hand over the product approvals your inspector will want to see at final.
Plan a new roofCracked tile, a boot that dried out, seams opening on a flat section over the Florida room, flashing pulling off a parapet wall. We chase the leak to its actual source, which is almost never directly above the stain, and fix that. If the roof has three patches already, we will say so.
Call about a repairWhat a Hollywood re-roof actually involves, before anyone quotes you a number.
Hollywood sits in the High-Velocity Hurricane Zone, so every system we install is tested and approved for HVHZ wind pressures rather than generic Florida ratings. Closer to the ocean there is a second clock running. Salt in the air corrodes fasteners, drip edge and vent flashing from the day they go on, and east of Federal Highway that clock runs two to three times faster than it does out by I-75.
Our expertise spans every aspect of roofing, so you can trust us for:
We use only the best materials from trusted manufacturers. Whether it’s concrete or clay tile, standing seam metal, or architectural shingles, we’ll recommend options that enhance both durability and curb appeal — and that carry the Miami-Dade Notice of Acceptance your roof needs to pass inspection.
Our fully licensed and insured team brings decades of combined experience to every project. We follow strict safety protocols and industry standards, ensuring your roof is built to perform and last.
We work Hollywood constantly, so we know the Building Division wants the in-progress nailing inspection before anything gets covered, and we schedule around it instead of losing a day. Hollywood Lakes and the historic districts come with extra review on anything visible from the street. In Emerald Hills it is usually tile, where the tile outlives the underlayment by fifteen years and homeowners are shocked to hear the roof is done.
Storm damage claims get denied on technicalities more often than homeowners realize. We document the damage properly, meet your adjuster on site, and speak their language so your claim reflects what the roof actually needs. No pressure, no inflated scope.
From the beach through North Central Hollywood, salt reaches the roof every single day. It does not attack the tile or the shingle first, it attacks the metal: nails, valley flashing, drip edge, vent collars. We have pulled twelve-year-old roofs where the covering was fine and the fasteners were rust. Stainless and coated hardware is the only thing that changes that math.
The Florida room, the carport enclosure, the back bedroom someone added in 1972. Low-slope sections drain slowly, hold water after every storm, and fail decades before the sloped roof beside them. They are a separate system with a separate lifespan, and they can usually be replaced on their own.
Carriers across Broward are non-renewing homes over a certain roof age regardless of condition. We see it weekly in Hollywood, where a 2004 shingle roof passes a visual inspection and still gets a cancellation letter. A wind mitigation report and a documented replacement usually settle it, and we can tell you which one your carrier wants.
We come out, walk the roof, photograph what we find, and give you a written assessment of its actual condition. No charge, no obligation, and no pressure to sign anything on the spot.
Tile, metal, shingle, or low-slope. Repair or full replacement. We lay out the options that genuinely fit your roof, your HOA requirements, and your budget — and we tell you when a repair will do instead of pushing a replacement you do not need yet.
You get a written quote with the scope, materials, and timeline spelled out line by line. No hidden fees, no surprise change orders halfway through the job.
Our own licensed crews do the work. We pull the permits, schedule the inspections, protect your landscaping and pool cage, and secure the site every night before we leave.
We magnet-sweep the property for nails, haul away every scrap of debris, and walk the finished roof with you before handing over your warranty paperwork and permit close-out.
Hollywood roofs age on two clocks at once: the ordinary Florida one and the salt clock running along the coast. Advance Quality Roofing inspects for free, pulls the city permit, and gives you a written scope that says plainly whether you need a repair, a section replaced, or the whole roof done.
Straight answers from licensed contractors who work in Hollywood every week.
The City of Hollywood Building Division, through its own permitting process rather than Broward County. We file it, upload the product approvals and schedule the inspections. Typical re-roofs clear review in one to three weeks depending on season and whether the property sits in a historic district.
Yes, once the contract price hits $5,000. It gets recorded with Broward County and posted on site before work begins. Missing that recording is one of the most common reasons a final inspection fails in Hollywood, so we prepare it for you.
Materially, yes. Within about a mile of the ocean we upgrade to corrosion-resistant fasteners and flashing and detail the edges for higher uplift. The covering may be identical to an inland job; the metal underneath it is not.
The tile can. What fails is the underlayment beneath it, usually between fifteen and twenty-five years in this climate. On a tile roof we can often lift, stack and relay the existing tile over new underlayment, which costs less than a full material change.
Nothing. We walk the roof, photograph the problem areas and send you a written report. There is no charge and no obligation, and the report is yours whether you hire us or not.
Yes. We document damage before anything moves, meet the adjuster at the property, and make sure the scope reflects what the roof needs rather than what fits in a first estimate.
Noisy for three to seven working days on a typical single-family home, tile longer than shingle. We protect landscaping and pool cages, magnet-sweep for nails daily, and secure the site each evening.
The state grant program matches spending on wind-mitigation improvements, roofs included, for eligible homesteaded properties. Funding opens in rounds and closes fast. We can tell you whether your home is likely to qualify.
Residential Services Across Miami-Dade, Broward & Palm Beach